Building and Zoning Fees

Code Section
Subject
Rates or Amount
1-9Sale of Code
Sale of Supplements
Actual cost to Village $150
74-2Annual license fee for operating a bowling alley, shooting gallery, or skating rink, or a renewal thereof$300
74-7(B)Daily fee for license to operate: 1. Rodeo, Circus, or Carnival
2. Carousel or merry-go-round
$375
74-10Annual license fee to permit dancing, cabaret shows, or other exhibitions or performances, or a renewal thereof$375
74-16Annual license to maintain a motion-picture house or building in which any theatrical performance or motion-picture shall be given or shown, or a renewal thereof$750
78-3(C)Redemption fees, dogs at large
1. First Redemption
2. Second Redemption

$78
$113
78-14Dog License Fee
A. Each neutered male or spayed female
B. Each un-neutered male or un-spayed female

$12.50
$20.50
86-9(A)Fees for building permits and certificates

1. Permit for a new structure or alterations to an existing structure: a. RESIDENTIAL - new building
when cost of structure is $1,000 or less
when cost exceeds $1,000
b. RESIDENTIAL - alteration
when cost of alteration is $1,000 or less
when cost exceeds $1,000
c. COMMERCIAL - new building
when cost of building is $1,000 or less
when cost exceeds $1,000
d. COMMERCIAL - alteration
when cost of alteration is $1,000 or less
when cost exceeds $1,000

$150
$150 plus $15 for each $1,000 or fraction thereof in excess of $1,000
$150
$150 plus $10 for each $1,000 or fraction thereof in excess of $1,000
$300
$300 plus $15 for each $1,000 or fraction thereof in excess of $1,000
$300
$300 plus $15 for each $1,000 or fraction thereof in excess of $1,000

2. Permit to demolish a structure or part thereof: a. Frame residence
b. Frame commercial
c. Frame accessory
d. One story masonry
e. Each additional story

$300
$600
$150
$225
$75

3. Fences
a. New
b. Replacement

$0.75 per linear ft.
$0.75 per linear ft.

4. Construct pools exceeding 5,000 gallon capacity: a. In ground
b. Above ground

$300
$150

5. Permit for bulkheads and piles
a. New bulkhead add / replace
b. Pole (new, replacement, relocate) c. Resurface /replace existing bulkhead

$300 for first fifty (50) linear feet and $1.50 for each additional linear foot $38
$150 for first fifty (50) linear feet and $1.50 for each additional linear foot

6. Floats, ramp and platform only (includes docks, piers, and boardwalks
Tie rods- Finger slips-

$150 / each
$38 per tie rod
$150 per slip

7. Certificate of Occupancy$150.00

8. Amended or duplicate Certificate of Occupancy$75.00

9. Certificate of Compliance$150.00

10. Temporary Certificate of Occupancy valid of ninety (90) days and subject to renewal pursuant to Section 86-8 E$300.00

11. Letter required by title company (including letter in lieu of a C.O.)$113.00

12. Code compliance inspection and issuance of letter stating status of compliance with requirements of Village Code (includes FHA)$113.00

13. Electrical permit as required under Section 86-6A(1)$30.00

14. Process National Flood Insurance Forms$30.00
90-3Permit fee for moving a building or other structure upon or across streets in the Village$300.00
106-18Examination fee, license fee, license renewal fee for master electrician's license: A. Examination fee, to be applied to the cost of the master electrician's license fee upon qualification for a license upon examination
B. License fee for the whole or any part of the license year in which it is issued
C. Renewal fee annually
D. Annual fee for electricians not licensed by the Village and performing work in the Village in accordance with Section 106-6, Subparagraph 4 of the Village Code

$75
$225
$225
$300
115-37Permit for the installation of storage tanks for flammable liquids: 1. First Tank
2. Each additional tank installed on the same site at the same time

$300
$150
115-55Permit fee, installation or removal of oil burner and equipment, oil tank
1. Filing fee, installation of oil burner and equipment
2. Permit fee, installation of an oil tank

$75
$75
115-56(c)Filing fee, Certificate of Approval to install oil burner$75
124-4Food and Drink Dispenser's fees
1. License
2. Renewal

$115
$115
128-27Rental permit fees
1. One rental unit
2. Building with two rental units
3. Three rental units
4. Four rental units
5. Units in excess of four

$100
$300
$550
$700
$100 / each
133-3Junk Dealer's license fee$375.00
133-6(A)Auto wrecker's license fee, renewable annually
1. License
2. Renewal

$575
$575
158-7(A)Hawkers and Peddlers license
1. License fee, renewable June 1st annually
2. License fee for license issued subsequent to November 30th of any year

$450
$225
162-33Examination fee to qualify as, certificate to engage in the business of, master or employing plumber: 1. Examination Fee
2. License Fee

$75
$225
162-36(a)Fee to renew master or employing plumber's certificate or license: 1. Renewal fee annually, on or before May 1st
2. Fee for issuance of new certificate or license, if renewed after May 1st

$225
$225
162-37Duplicate certificates: A. Certificate of Competency
B. Certificate of Record

$40
$25
162-53Plumbing Permit: 1. New construction (first five fixtures) 2. Additional fixtures
3. Alterations (first five fixtures) 4. Additional alterations

$90
$7.50
$90
$7.50
162-130(B)Fee for Certificate of Approval, gas piping: 1. Gas test
2. Gas Stove
3. Gas Burner

$60
$60
$60
171-7(A)License fees, rooming and lodging houses, renewable annually June 1: 1. One rental unit
2. Buildings with two rental units
3. Three rental units
4. Four rental units
5. Units in excess of four

$150
$225
$262
$287
$20 / each
173-3(C)Secondhand Dealers license fees: General license fee, renewable on or before April 2nd annually$375