Fees will be doubled if the permit is issued after work begins.
Residential Fees
- First $1,000 Construction Fee (new building) = $150
- Each Additional $1,000: $22
- First $1,000 Construction Fee (alteration) = $150
- Each Additional $1,000: $22
Commercial Fees
- First $1,000 (new or alteration) Construction Fee: $300
- Each Additional $1,000: $22
A $150 letter of completion fee must be added to all Building Permit Applications (except for fences and roofs).
Fences
- New: $.75 per linear foot
- Replacement $.75 per linear foot
Outdoor Decks & Balconies
- $48 per square foot to ascertain the cost of construction, then, use Residential Fee for the cost of the permit.
Pools
- Above Ground Pool: $150
- In-Ground Pool: $300
- Certificate of Occupancy: $150
- Temporary C.O.: $300
- Amend Duplicate C.O.: $75
- Letter of Completion: $150
- Letter in Lieu: $113 (Must put a written request in for Letter in Lieu. An inspection is required and an electrical survey must be submitted before the letter can be issued.)
Plumbing Permits
- New Construction / Alteration: $90 (for the first five fixtures)
- Additional Fixtures: $7.50
- Gas Test / Gas Burner / Stove: $60
- Gas Water Heater: $60
- Gas Unit Heaters: $7.50
Demolition Permits
- Frame Residence: $300
- Frame Commercial: $600
- Frame Accessory: $150
- One-Story masonry: $225
- Sign Permit: $150
- Sign Renewal: $150
- Electric Permit: 30
A $150 letter of completion fee must be added to all Demolition Permit Applications.
Rental Permit Fees
- One Rental Unit: $150
- Two Rental Units: $225
- Three Rental Units: $262
- Four Rental Units: $287
- Each Additional Unit in Excess of Four: add $20 (Fee not refundable)
Air Conditioning / Refrigeration / Heating
- Residential: $75
- Commercial: $150 per unit plus $7.50 per $1,000 cost of construction or fraction thereof for piping, radiators, and ductwork.
- Oil Burner / Oil Tank / Hot Water Heater: $75 (install / remove)
- Installation of storage tanks for flammable liquids: $300 for the first tank
- Each additional tank installed on the same site at the same time: $150
- Storage tanks (non-flammable): $75 (install / remove)
Bulkhead Fees
*Refacing or resurfacing bulkheads is no longer permitted.
- New Bulkhead / Add / Replace: $300 for the first 50 fee and $1.50 each additional foot
- Float, Ramp, and Platform: $150 each (Includes docks, piers, and boardwalks)
- Poles / New / Replacement / Relocate: $38 per pole
- Tie Rods: $38
- Finger slips $150 per slip